Planning a model is a form of takeoff because you are selecting all the labor and material required for a model instead of an estimate. For example, a garage model might include assemblies for a slab, stud walls, and roof as well as door and siding items.
Fill out one copy of this form for each model you plan to set up.
|
Model (code) Use up to 20 characters |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Group Select the box if this is a group model. |
q |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Description Use up to 70 characters. |
|
| Question |
Question Description |
Default Calculation |
Question Type (Text, Numeric, Yes/No) |
|---|---|---|---|
| Example: ShowPicture |
Would you like to see a picture of the building type? | Yes/No | |
|
Assembly |
Assembly Description |
Assembly Unit |
Assembly Calculation |
|---|---|---|---|
| Example: 0301a |
Foundation - Footing NoRbar Some Choice | cy | aCY Concrete 0301 |
| Phase code |
Item Code |
Item Description |
Takeoff Unit |
Formula |
|---|---|---|---|---|
| Example: 2315.021 |
20 | Excavate Footing By Machine | cy | CY L x W x D'/27 |