Export change order to job cost wizard: Introduction
Changing events, or information that was unknown at the time
a contract was made, may necessitate a change order. Change orders are used
after the budget has been generated and can modify contract time and dollar
amounts. Change orders can be additions or subtractions to the
job contract.
You use the Export change order to job cost wizard, available from the menu and on the ribbon, to create a change order in Sage 100 Contractor from the information in an estimate
created in Sage Estimating.
During the export process, Sage 100 Contractor information is accessible through the Export change order to job cost wizard.
Before you begin
In the Manage Estimates window, select the estimate to use as the basis for the change order, and then:
- Specify the Job cost system name as Sage 100 Contractor.
- Specify the Sage 100 Contractor company and job.
To export a change order:
-
On the ribbon, click .
In classic view, click .
- On the Introduction
tab, read the information and instructions carefully.
- To proceed to Step 1 of creating a change order, click [Next].