To use an existing estimate to start a new estimate:
Click File menu > Copy Estimate to open the Copy Estimate window .
Beside the Source estimate box, click the [Browse] button, and then navigate to and select the estimate you want to copy.
Note: Sage Estimating creates and stores your new estimate in the same SQL Server instance and estimate database as the original source estimate.
Beside the Target branch box, click the [Browse] button, and then navigate to and select the location to display your new estimate in the Estimate Catalog.
Example: If you want to display estimates by location and project name and you are creating a new estimate for the "building electrical" project at City Hall, select the City Hall branch from the list, or browse to it.
Note: The branch is displayed for organizational purposes only. All estimates are stored on the same level iin the specified estimate database.
In the New estimate box of the Copy Estimate window, type the name of the new estimate you want to create.
Note: If the new estimate is located on the same branch as the existing estimate, type a unique name for the estimate.
Click [
].Sage Estimating creates the estimate and opens the Estimate Information window.
Complete the fields on the tabs. At a minimum, you need to complete the Project name field. The Job size field is not required, but we recommend filling it in.
To display help for a field, select the field, and then press F1.
Tip: If
you need to change the estimate information later, click Estimate
Information on the