Feature list
Important! Certain capabilities, menus, and icons described in help are available only if you have purchased the associated module.
| Feature | Sage Estimating Essential Feature |
Sage Estimating (SQL)
Feature |
Separately licensed modules for use with Sage Estimating (SQL)* | Integrations with Sage Estimating (SQL) and Sage Estimating Essential* |
|---|---|---|---|---|
| Addons (markups) |
✔ |
✔ |
||
| Adjust assembly productivity |
|
✔ |
||
| Adjust columns |
✔ |
✔ |
||
| Adjust job total and cost/unit |
✔ |
✔ |
||
| Advanced reports (Comparison, Variance, custom reports) | ✔ | |||
| Alternates | ✔ | |||
| Audit (takeoff audit) |
✔ |
✔ |
||
| Bids from subcontractors |
✔ |
✔ |
||
| Bill of Materials |
✔ |
✔ |
||
| Crews with unlimited rate tables | ✔ | |||
| Customizable External Tools menu | ✔ | ✔ | ||
| Database Editor | ✔ | ✔ | ||
| Estimate-level security | ✔ | ✔ | ||
| Estimate reports |
19 |
19 |
||
| eTakeoff |
|
|
✔ | |
| Find/Go To | ✔ | ✔ | ||
| Formula tables |
✔ |
✔ |
||
| Item tables | ✔ | |||
| Merge estimates |
✔ |
✔ |
||
| Model estimating | ✔ | |||
| Move/Copy |
✔ |
✔ |
||
| Multiple open estimates |
✔ |
✔ |
||
| Price update methods |
9 |
9 |
||
| Rich text notes | ✔ | ✔ | ||
| Roles and permissions |
✔ |
✔ | ||
| Sage 100 Contractor | ✔ | |||
| Sage 300 Construction and Release Estate | ✔ | |||
| Save one-time items to standard database |
✔ |
✔ |
||
| Saved report layouts |
✔ |
✔ |
||
| Scan for incomplete items |
✔ |
✔ |
||
| SDK (for third-party developers) | ✔ | |||
| Smart Assemblies |
✔ |
|||
| Subcontractors |
✔ |
✔ |
||
| Substitute spreadsheet items with other items |
✔ |
✔ |
||
| Tabbed and ribbon user interface with tear-off and dockable panes | ✔ | ✔ | ||
| Takeoff methods |
3 |
4 |
||
| Ten-level spreadsheets and reports |
✔ |
✔ |
||
| Totals page templates | ✔ | ✔ | ||
| Undo/Redo (on spreadsheet) | ✔ | ✔ | ||
| Unit conversion (imperial/metric) |
✔ |
✔ |
||
| Unlimited spreadsheet layouts |
✔ |
✔ |
||
| Unlimited spreadsheet sequences |
✔ |
✔ |
||
| User-defined subcategories |
✔ |
✔ |
||
| Vendors | ✔ | ✔ | ||
| Work breakdown structures |
40 |
40 |
Note: *These products must be purchased separately.