Export budget to job cost wizard: Step 3
In this step, you can include a phase for the budget in Sage 100 Contractor. To include a phase, you must specify the sort level in the estimate that corresponds to the phase in Sage 100 Contractor.
To export a budget – Step 3:
-
(Optional) Select the Include an estimate sort level to be used as a Sage 100 Contractor Phase checkbox, as needed.
If you select the checkbox, a list box containing all estimate sort levels becomes available.
-
If you selected the checkbox, select a sort level from the list box.
- Click [ ].