Export change order to job cost wizard: Introduction
Changing events, or information that was unknown at the time a contract was made, may necessitate a change order. Change orders are used after the budget has been generated and can modify contract time and dollar amounts. Change orders can be additions or subtractions to the job contract.
You use the
During the export process, Sage 100 Contractor information is accessible through the Export change order to job cost wizard.
Before you begin
In the Manage Estimates window, select the estimate to use as the basis for the
- Specify the Job cost system name as Sage 100 Contractor.
- Specify the Sage 100 Contractor company and job.
To export a change order:
-
On the ribbon, click
.In classic view, click
. - On the Introduction tab, read the information and instructions carefully.
- To proceed to Step 1 of creating a change order, click [Next].