Feature list
Important! Certain capabilities, menus, and icons described in help are available only if you have purchased the associated module.
Feature | Sage Estimating Essential Feature |
Sage Estimating (SQL)
Feature |
Separately licensed modules for use with Sage Estimating (SQL)* | Integrations with Sage Estimating (SQL) and Sage Estimating Essential* |
---|---|---|---|---|
Addons (markups) |
✔ |
✔ |
||
Adjust assembly productivity |
|
✔ |
||
Adjust columns |
✔ |
✔ |
||
Adjust job total and cost/unit |
✔ |
✔ |
||
Advanced reports (Comparison, Variance, custom reports) |
✔ |
|||
Alternates |
✔ |
|||
Audit (takeoff audit) |
✔ |
✔ |
||
Bids from subcontractors |
✔ |
✔ |
||
Bill of Materials |
✔ |
✔ |
||
Crews with unlimited rate tables |
✔ |
|||
Customizable External Tools menu |
✔ |
✔ |
||
Database Editor |
✔ |
✔ |
||
Estimate-level security |
✔ |
✔ |
||
Estimate reports |
19 |
19 |
||
External Report |
✔ |
✔ |
||
eTakeoff |
|
|
✔ |
|
Find/Go To |
✔ |
✔ |
||
Formula tables |
✔ |
✔ |
||
Item tables |
✔ |
|||
Merge estimates |
✔ |
✔ |
||
Model estimating |
✔ |
|||
Move/Copy |
✔ |
✔ |
||
Multiple open estimates |
✔ |
✔ |
||
Price update methods |
9 |
9 |
||
Rich text notes |
✔ |
✔ |
||
Roles and permissions |
✔ |
✔ |
||
Sage 100 Contractor |
✔ |
|||
Sage 300 Construction and Release Estate |
✔ |
|||
Sage Intacct Construction |
✔ |
|||
Save one-time items to standard database |
✔ |
✔ |
||
Saved report layouts |
✔ |
✔ |
||
Scan for incomplete items |
✔ |
✔ |
||
SDK (for third-party developers) |
✔ |
|||
Smart Assemblies |
✔ |
|||
Subcontractors |
✔ |
✔ |
||
Substitute spreadsheet items with other items |
✔ |
✔ |
||
Tabbed and ribbon user interface with tear-off and dockable panes |
✔ |
✔ |
||
Takeoff methods |
3 |
4 |
||
Ten-level spreadsheets and reports |
✔ |
✔ |
||
Totals page templates |
✔ |
✔ |
||
Undo/Redo (on spreadsheet) |
✔ |
✔ |
||
Unit conversion (imperial/metric) |
✔ |
✔ |
||
Unlimited spreadsheet layouts |
✔ |
✔ |
||
Unlimited spreadsheet sequences |
✔ |
✔ |
||
User-defined subcategories |
✔ |
✔ |
||
Vendors |
✔ |
✔ |
||
Work breakdown structures |
40 |
40 |
Note: *These products must be purchased separately.