Move/Copy command

Use this command to change the sequence level of one or more items or assemblies in the spreadsheet.

It lets you move or copy items or assemblies from one spreadsheet level to another, and provides an easy way to allocate unassigned items. For example, if the location for an item is unassigned, you can select the item and move it to the appropriate location.

The list below shows which spreadsheet levels allow move and copy operations.

Move/Copy allowed Copy allowed Move/Copy not allowed

Alternates

Job cost phase

Location

Material class

Price code

Subcontractor

Unassigned

Vendor

WBS

Assembly

Combined Assembly

Model

Phase/Item

Takeoff order