Sub Number column

This spreadsheet column shows the number of the subcontractor assigned to each item, if any. When you choose the subcontractor you want to use in the Bid Grid, Sage Estimating (SQL) inserts that sub number into the spreadsheet. 

Tips:  

  • Click The List (ellipsis) button to choose from a list of subcontractors.
  • To remove a subcontractor, right-click and choose Clear Subcontractor. You can also click Cut on the shortcut menu or press Ctrl+X.
  • After you specify a bid for the estimate, the sub number is the same in the spreadsheet and the Bid Grid.