Changing the job size or unit
- From the Show/Hide group of the View tab, select the Totals checkbox to open the Totals window .
- In the Totals window, click the arrow
to the right of
and select Edit
Job Size to enter the new size or unit of measure for the job.
Sage Estimating (SQL) updates the cost/unit for the job to reflect your changes. It also updates the Job size and unit in the Estimate Information window with the new job size or unit.