Changing an existing group phase
-
Open the Phase window in one of the following ways:
- On the ribbon, from the Data tab, click . group on the
- In classic view, click Database > Phases.
- From the spreadsheet, select a phase row, right-click, and then click Edit Phase on the shortcut menu.
Note: The source option indicates where the displayed group phase is stored. You can change a group phase in either the estimate or the standard database.
If you want to add or edit a phase in the standard database, select Database as the Source option. The window then becomes the Database Phase window.
-
Select the group phase you want to change.
You can click to choose from a list of existing phases, or scroll through the phases using [<<] and [>>].
-
Make changes you need.
-
To change the phase code, click [Renumber], and then enter the new code in the Phase field.
-
To change an entry in a text box, click in the box, drag the cursor to select the entry, and then type in the new information.
-
-
When you finish changing the group phase, click [OK] to save it.
-
Change other group phases in the same manner. When you finish, click [Close].