Working with standard databases > Building and modifying a standard database > Bill of materials > When to set up a bill of materials
Learn more

Changing a bill of materials

Setting up a bill of materials (BOM)

Bill of Materials (BOM) report

Changing an existing material class

Setting up a new material class

Material Class report

Bill of Materials window

When to set up a bill of materials

You should set up a bill of materials if you want to be able to print the following reports from Sage Estimating:

Setting up a bill of materials involves assigning material items in your standard database to material classes. As you set up your bill of materials, you specify:

After you assign an item to a material class, the bill of materials information is included with the item during takeoff.

Example