About cutting, copying, and pasting spreadsheet items
Cutting or copying items from one estimate to another
Dragging items from one estimate to another
Dragging items to another spreadsheet level in the same estimate
Use this command to change the sequence level of one or more items in the spreadsheet. It lets you move or copy items from one spreadsheet level to another, and provides an easy way to take care of unassigned items. For example, if the location for an item is unassigned you can select the item and move it to the appropriate location.
The list below shows which spreadsheet levels allow move/copy operations.
Move/Copy allowed | Move/Copy not allowed |
---|---|
Job cost phase Location Material class Subcontractor Unassigned Vendor WBS |
Assembly Phase/Item Takeoff order Combined Assembly Model |
Tips: