Setting up a bill of materials (BOM)
When to set up a bill of materials
Changing a bill of materials
To change a bill of materials:
-
Open the Bill of Materials window in one of the following ways:
- On the ribbon, from the Bill of Materials. group on the tab, click
- In classic view, click Database menu > Bill of Materials.
- On the spreadsheet, in the Material Class or BOM Desc columns (if they contain information), select Edit Bill of Materials from the shortcut menu.
Note: If both an estimate and a standard database are open, the estimate BOM information is displayed initially. You can use the options to switch between the estimate and the database BOM. (If only an estimate or a standard database is open, you cannot switch to the other option.)
-
To change a bill of materials stored in the standard database, select the Database option.
To change a bill of materials for this estimate only, select the Estimate option.
- Expand the Material Classes list as needed.
- Make changes as needed. You can:
- When you finish changing your bill of materials, click [Close].
Tip: To edit the bill of materials for an estimate, Edit Bill of Materials is also available on the shortcut menu from the BOM description field of the Detail window.